• CC Event_gimp.jpg
  • baseball2.jpg
  • volleyball-sand.jpg
  • Program_gimp.JPG
  • basketball_gimp.JPG
  • baseball_gimp.JPG
  • dogpark.jpg
  • skatepark.jpg
  • football2_gimp.JPG
  • programs_s_b_gimp.jpg
  • cheerleading.jpg
  • soccerg.jpg
  • volleyball2.jpg

PARDON OUR PROGRESS!

 street-building-construction-industry

Work has begun on the repaving of all the roads in Pelican Park. This long awaited project started today with the removal of the top two inches of asphalt. Work will be ongoing during the next two weeks. You will, at times, encounter uneven surfaces, drive on milled roads and drive on roads without safety lines or markers. Please drive slowly for your safety and those around you.

Daytime users of the Park might incur slight delays and flagging for safety reasons but, at no time will access in to or out of the Park be blocked.

To minimize the impact to our Park users, work will NOT be done after 5pm or on Saturdays.

The Recreation District owns and operates their own roadway system. We have saved for 10 years in anticipation of having to repave the roads. The project will cost just over $528,000.00 and was done in accordance with State bid laws.

Thank you for your understanding and cooperation during construction and we look forward to having new roads for you, our users.


Pelican Park... making a difference in children's and adults' lives

Home | Login | Search


63350 Pelican Drive ● Mandeville, Louisiana 70448 ● Phone: (985) 626-7997 ● Fax: (985) 626-9028
Copyright ©2017 Recreation District #1 St. Tammany Parish, LA. All Rights Reserved.